p  Manufacturing of separators (two stages) and heat exchangers for parks dedicated to crude oil gathering and treatment -  Petrom E&P and Petrom Refining customer

p  Repairing of oil equipment  for Petrom E&P and Petrom Refining customer

p  Repairing of electrical engines and transformers for Petrom E&P customer, within 2002 – present.

p  Main contractor for project: TAME (Tertiary-Amil-Methyl-Ether) installation – Petrobrazi Refinery – Petrom customer

n  Technological installations (6 fractioning distillation columns, 11 pressure vessels, 23 rotary pumps and of 2 dosimeter pumps, performing of technological pipelines installed on scaffolds, thermal insulation, instrumentation,  data gathering system – SCADA);

n  Electrical installations (performing of energetic and earthing works, ANTIEX force and illumination);

n  Construction works (concrete platforms, access ways, fireproof insulation of equipment and pipelines, construction of utilities networks, heating system).

 

p  General contractor for construction of parks for gathering and treatment of crude oil,  Petrom E&P, within 2002-2005:

n  Park 201 Colibasi, Park 701 Gura Ocnitei, Park Receptie, Park 4 Cobia,

n  Central storage facility SUD3

 

p  Main contractor for construction of storage facilities of ecological silt

n  Moreni deposit

 

p  Main contractor for construction of fuel distribution stations: PSV has a portfolio of approx. 28 such kind of projects (PECO 2,12 Târgovişte, PECO 4 Pucioasa, PECO 1 Răzvad, PECO Viişoara, PECO Dărmăneşti, PECO 9 Moineşti, PECO 2,16 Bacău, fuel distribution station OMV Slatina, PECO 2 Faget, PECO 4 Bicaz, PECO Vinga, PECO 15 Voinesti, PECO Patarlagele, PECO Brezoi etc). PSV was main contractor for construction/revamping of fuel storage facilities from Mihaesti Valcea and Cluj – customer LUKOIL Romania.

p  Main contractor for project: “Gas and condensate gathering and processing installation from Tolkyn area” – Barankol, Kazakhstan. Customer: ASCOM Republic of Moldova.

p  Supplier of equipment (tanks of 5000 m3) for HOMS Refinery Syria.

p  Supplier of equipment and vessels for  “Crude oil gathering, treatment and storage installation from Tasbulat oil field”, Petrom – Kazakhstan customer.

p  Main contractor for gas drying plants from: Mihaesti, Icoana, Boldesti, Barbuncesti, Garbovi, Stancesti, Baraitaru, Varteju, Ticleni etc. and gas compressors stations from  Iconita, Boldesti, Grajdana, Barbuncesti etc. -  Petrom E&P customer.